Maintenance and operational strategy
The RIBA Plan of Work 2013 defines the Maintenance and Operational Strategy as: ‘The strategy for the maintenance and operation of a building, including details of any specific plant required to replace components.’
The RIBA Passivhaus Overlay, published by the RIBA in 2022, states in relation to maintenance and operational strategies: “These define how systems will be maintained and by whom, and should also cover commissioning and user guidance. The maintenance and operational requirements of various systems inform and influence the initial project brief. Therefore, knowing who and how systems will be maintained, and filters will be changed, impacts upon the location and space planning of the mechanical ventilation heat recovery units. Also, to assist with the measurement, calibration and commissioning of building services equipment, a Commissioning Plan and Programme should be developed, reviewed, updated, and implemented by the project team. Commissioning may be undertaken at various points prior to completion – to allow fault finding/remediation – and then at agreed intervals during the defects liability period (and later) – to verify that the systems comply with the construction documents/contract and design intent. More broadly, to support the daily use and operation of the building, appropriate guidance for each user group should be provided in the form of a quick start user guide. Refer to RIBA Plan for Use for supporting information.”
[edit] Related articles on Designing Buildings
Featured articles and news
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.





















Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.