Maintenance and operational strategy
The RIBA Plan of Work 2013 defines the Maintenance and Operational Strategy as: ‘The strategy for the maintenance and operation of a building, including details of any specific plant required to replace components.’
The RIBA Passivhaus Overlay, published by the RIBA in 2022, states in relation to maintenance and operational strategies: “These define how systems will be maintained and by whom, and should also cover commissioning and user guidance. The maintenance and operational requirements of various systems inform and influence the initial project brief. Therefore, knowing who and how systems will be maintained, and filters will be changed, impacts upon the location and space planning of the mechanical ventilation heat recovery units. Also, to assist with the measurement, calibration and commissioning of building services equipment, a Commissioning Plan and Programme should be developed, reviewed, updated, and implemented by the project team. Commissioning may be undertaken at various points prior to completion – to allow fault finding/remediation – and then at agreed intervals during the defects liability period (and later) – to verify that the systems comply with the construction documents/contract and design intent. More broadly, to support the daily use and operation of the building, appropriate guidance for each user group should be provided in the form of a quick start user guide. Refer to RIBA Plan for Use for supporting information.”
[edit] Related articles on Designing Buildings
Featured articles and news
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation which closes 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.